Surveying and Mapping Best Practices for Solar Development Projects

Thew Equipment 2 Lo

Due in large part to aggressive renewable energy goals and the push for decarbonization, the solar industry is booming in New York State. Over the past few years, Thew Associates has served as the land surveying consultant for numerous community and utility scale solar developments throughout the United States. As with most land development projects, topographic, utility, and boundary retracement surveying and mapping are essential components for the development of a solar project. We have compiled a few items we consider to be “Best Practices” for solar development professionals when procuring professional surveying and mapping services. The first topic of discussion is General Procurement.

Procurement

Some solar developers look to their environmental permitting and/or site/civil consultant to procure the surveying and mapping for a project. While it may seem convenient to have the design professional subcontract with a professional land surveyor, there are strategic advantages for the developer to retain control of the professional land surveyor.

  • Decreased Project Costs: Procuring the surveyor directly eliminates the mark-up (frequently 10%) the design professionals typically include for utilizing a subconsultant and management costs to cover the time necessary to manage the surveying subconsultant.
  • More efficient project management: Frequently, the Solar Developer is dealing with real estate issues such as parcel acquisition, creation of lease parcels, subdivisions, access and utility easements, commitments for title insurance. These items typically are legal matters that design professionals do not handle on a routine basis.
  • Eliminate the middle-man: Generally, the design professional simply acts as an intermediary conveying information between the Developer and the Surveyor.

Watch for our next topics regarding topography, UAV LiDAR and ALTA/NSPS Land Title Surveys for Solar Developments.

Part 2- Surveying and Mapping Best Practices for Solar Development Projects

thumbnail_SylvanBeach4.jpg

In continuation of our series on “Best Practices” for solar development professionals when procuring professional surveying and mapping services, this post will take a look at topographic data collection for solar development projects. Topographic mapping is required to facilitate site/civil design for solar developments and thus is a vital component to consider.

Public LiDAR

We are frequently asked if publicly available LiDAR can be utilized as a source for topographic information.  Our typical response is “it depends”.  If a two-foot contour interval is sufficient for site/civil design and the site topography is relatively uniform, then yes, publicly available LiDAR may be suitable.  However, our experience is that LiDAR with a point density of ≤ 2 points per square meter (ppsm) in wooded terrain is not sufficient to meet the accuracy requirements for two-foot contours.  Public LiDAR data sets that have point densities greater than 4 ppsm have proven to meet the accuracy standards for two-foot contours.

Public LiDAR data sets acquired prior to 2012, typically don’t meet the accuracy standards, especially in wooded or brushy areas.

Frequently, the public LiDAR data sets are not dense enough to identify and extract breakline information, which can significantly impact the accuracy of the digital terrain model (DTM).  Creating a DTM surface from publicly available LiDAR on sites with irregular terrain and numerous breaks in grade may not provide an accurate representation of the ground surface.

Ground truthing and check shots are required to confirm the accuracy of LiDAR data sets to ensure the data meets the required ASPRS (American Society of Photogrammetry and Remote Sensing) standards for vertical mapping.  The vertical accuracy is determined by taking the root mean square error (RMSE) between the LiDAR derived elevations and the ground survey check shot elevations.  Topographic mapping sufficient for two-foot contours must have an RMSE of ≤20cm in non-vegetated terrain (ASPRS Vertical Data Accuracy Class VI).

Every Developer and Design Professional should be aware that accurate breaklines and planimetric information (e.g. buildings and structures, headwalls, railroads, paved and unpaved roads, utilities, signs, etc.) cannot be extracted from a public LiDAR data set due to the sparsity of the point cloud.

Ground Surveys/UAV/Manned Aircraft

In some instances, the site/civil engineer requires topography with a one-foot contour interval for storm water and access road design, which will require employing conventional surveying techniques (i.e. ground survey), UAV-mounted LiDAR and aerial photography, or manned aircraft LiDAR and aerial photography.

The size of the project and land cover type (i.e. woodlands, abandoned agricultural lands, or active agricultural lands) will dictate the most efficient means of collecting topographic and planimetric information.

Ground surveys may be more economical to conduct if a site is relatively small (i.e. less than 30 acres) and is open agricultural lands, while UAV LiDAR data and aerial photography acquisition is most economical for open or wooded sites ranging from 10 to 500 acres.  Acquisition of LiDAR and aerial photography from a manned aircraft is typically more economical for large projects ranging from 300 to several thousand acres.  The disadvantage of utilizing manned aircraft is that data must be collected during periods of “leaf-off” without snow cover.  UAV LiDAR can be acquired in “leaf-on” conditions because of the greater point density due to the low altitude and slow speeds the UAV’s operate at.

Conclusion

For solar developments, we would generally recommend acquiring topographic information suitable for 50 scale (1” = 50’) topographic mapping with a one-foot contour interval utilizing any of the three methods cited above.

The following table summarizes the advantages and disadvantages for topographic data collection options available for solar development projects.

Thew Table

It is our experience that allocating financial resources for the collection of accurate topographic and spatial information on the front end of project development pays dividends throughout the life cycle (civil/site design and construction) of the project.

For additional information regarding topographic surveying and mapping for solar developments or to obtain additional information regarding Thew Associates land surveying offerings, please contact Mr. Cameron Wattles at 315.244.2151 or by e-mail at This email address is being protected from spambots. You need JavaScript enabled to view it..

Land

Land Surveying

Water

Hydrographic Surveying

Subsurface

Subsurface Utility Engineering

Laser Scanning

3D Laser Scanning Services

sUAS

Drone Services

Canton

6431 US Hwy 11
Canton, NY 13617

Phone: 315-386-2776 
Fax: 315-386-1012

Utica

9478 River Road
Marcy, NY 13403

Phone: 315-733-7278
Fax: 315-797-1957

Saranac Lake

135 Broadway
Saranac Lake, NY 12983

Phone: 315-386-2776

Syracuse

5866 State Route 31 
Cicero, NY 13039

Phone: 315-244-2151

Thew Associates Land Surveyors
Site Design by Coughlin